インドネシア Podomoro Industrial Park[PIP]
基本情報
団地名 | Podomoro Industrial Park[PIP] |
---|---|
WEB | |
国名 | インドネシア |
所在地 | Karawang,Barat |
事業主体 | PT Buana Makmur Indah |
面積 | 542ha |
対象施設 | |
道路 | |
鉄道 | |
空港 | スカルノ・ハッタ空港70km |
港湾 | タンジュンプリオク港60km |
都市計画用途地域 | |
用水 | Water Supply System : First Phase Capacity 8,620 m3/day Intake point at the Tarum Barat Canal 24 hour non stop industrial water supply at 1 to 2 bar pressure. |
排水 | Waste Water Treatment Plant : Waste water treatment plant methodologi is Food Chain Reactor System, discharge point at Cibeet River. First Phase Plant capacity is 7,500 m3 /day Influence standard : bOD 600/mg COD 900/mg TSS 400/mg Storm Water Drainage System : Flood free design Drainage would be constructed to flow out excessive water to Cibeet River. |
電力 | Power Supply : First Phase 80 MVA Premium quality supply by PLN (State own power supply company), Total 400 MVA for 1800 Ha with spindle underground network system and independent substation within the estate. Electricity will be supplied to individual tenant at 20 KV @50 Hz. Each tenant should convert to 220 volt or 380 volt by their own transformer. Consumption & connection charge according to PLN premium rates. |
ガス | Natural Gas Supply : Provided by PT. PERUSAHAAN GAS NEGARA (PT PGN) and PT.PERTAGAS (P.T.PERTAMINA Subsidiary). Both are state own gas companies. |
譲渡単価 | n.a |
賃貸区分 | n.a |
連絡先 | PT. Buana Makmur Indah TEL : +62-21 29119090 FAX : +62-21 29119050 E-mail : marketing@podomoroindustrialpark.com |
備考 |
公開日 2019/03/13 最終更新日 2019/04/09